A cosa bisogna prestare attenzione quando si installa un sistema di raffreddamento della pila di ricarica CC?

1.Understand the characteristics of the DC charging pile cooling system
Before installing a DC charging pile cooling system, you need to understand the characteristics of the equipment. This includes things like the device’s size, weight, operating temperature range, and power requirements. Ensure that the equipment has sufficient space and power required for its operation at the installation site, and ensure that the operating temperature range of the equipment meets actual requirements.
2.Dealing with common problems of DC charging pile cooling system
During the installation and use of the DC charging pile cooling system, you may encounter some common problems. Here are solutions to common problems:
- Insufficient cooling/heating effect: This may be caused by scaling inside the equipment, blocked pipes, or insufficient refrigerant. Maintenance and maintenance should be carried out regularly, including cleaning internal scale, replacing filters, adding refrigerant and other measures.
- Equipment abnormality: If the equipment has abnormal sound, vibration or odor, it should be shut down immediately for inspection. It may be caused by damaged internal parts of the equipment, broken pipes, or other reasons. The manufacturer or maintenance personnel should be contacted in time for maintenance.
- Electrical failure: If the equipment cannot start normally or other electrical failures occur, you should check whether the power connection is normal and whether the wires are damaged or loose. If you cannot solve it yourself, you should seek help from an electrician.
- Waterway system problems: If the equipment has problems such as water leakage, insufficient water volume, or abnormal water temperature, you should check whether the waterway system is well sealed and whether the accessories are damaged. If you cannot solve it by yourself, you should contact the manufacturer or maintenance personnel for repair.
As a device that can provide both high and low temperature environments, the correct installation and use of the DC charging pile cooling system is crucial to giving full play to its performance. This article will discuss the points to note during the installation of the DC charging pile cooling system.
Liquid Cooling Chiller(Commercial Energy Storage)
Battery Energy Storage Systems are filled with many battery cells, generating a large amount of extreme heat load. This means that the cooling system needs to precisely control the temperature and efficiently dissipate the l…
Liquid Cooling Chiller(Charging Pile)
Model CHDYL-4 -45℃~55℃ Cooling Power 4KW Temp control accuracy ±1℃ Real-time temperature record Refrigerant Brine circulation system fully enclosed design Flow 1.8~5.5L/min Pressure 0.7bar Minimum water inlet temperature 15°C (…
Liquid Cooling Chiller(Energy Storage)
Modello CNYL -45~55 Capacità di raffreddamento 45KW Precisione del controllo della temperatura ±0,5℃ Registrazione della temperatura in tempo reale Refrigerante secondario Glicole etilenico antigelo, design completamente chiuso del sistema di circolazione del refrigerante Refrigerante R41...
loading…
已经是到最后一篇内容了!
Raccomandazioni correlate
-
Analisi di simulazione e analisi dei risultati della gestione termica del pacco batterie
1600analisi di simulazione della gestione termica del pacco batterie
Visualizza dettagli -
A cosa bisogna prestare attenzione quando si installa un sistema di raffreddamento della pila di ricarica CC?
1263Before installing a DC charging pile cooling system, you need to understand the characteristics of the equipment. This includes things like the device's size, weight, operating temperature range, and power requirements. Ensure that the equi...
Visualizza dettagli -
KRY 0℃~+100℃(1&6)
3140Simulazione della temperatura per il test di qualità del veicolo: test di durata della batteria, banco di prova dell'iniettore/motore, test dell'airbag, banco di prova dei componenti, ecc. Può simulare le condizioni ambientali esterne del clima...
Visualizza dettagli -
How to use the 4kW new energy charging pile cooling system?
12584kW liquid cooling chiller for new energy charging pile
Visualizza dettagli
Refrigeratori industriali LNEYA Produttore Fornitore










