Descrizione del sistema di alimentazione e della strumentazione elettronica di controllo dei congelatori a bassissima temperatura
Ultra-low temperature freezer needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspected?
Check the ultra-low temperature freezer power supply and the electronic control instrument system. Before starting the power, check whether the power distribution capacity matches the unit power, and whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully check all the electrical circuits of the ultra-low temperature freezer, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is suitable. Capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the ultra-low temperature cold box, so regular inspection is recommended.
Raccomandazioni correlate
-
What are the main points for regular maintenance of the recirculating chiller?
919Recirculating chillers are used frequently in the industry, and the heat generating parts of various devices require recirculating chillers, so operating efficiency is very important. During the running time of the recirculating chiller, it is nec...
Visualizza i dettagli -
Il ruolo del sistema di controllo della temperatura TCU nel reattore chimico e farmaceutico
1271Il controllo della temperatura del bollitore di reazione nella ricerca e sviluppo di farmaci e negli esperimenti chimici, così come il controllo della temperatura nella produzione sperimentale su piccola scala e nei processi di produzione industriale, richiedono una tempera...
Visualizza i dettagli -
The cooling circulation system is used to collect the non-condensable tail gas in the distillation s
986Most rectification towers are two-stage condensation. The first stage uses cooling water, mainly condensing the top steam, and the second stage uses chilled water or ethylene glycol, which is mainly used to treat tail gas and remove a small amount...
Visualizza i dettagli -
Component and component tester for special environments
1588With the continuous development of the semiconductor industry, component component testing has been widely used in components in the fields of industry, scientific research, pharmaceuticals, and chemical industry. At present, there are quite a few...
Visualizza i dettagli