How to eliminate the failure of large thermal shock test chamber?
As technology continues to advance and improve, LNEYA recommends strict requirements for operators of large thermal shock test chambers. If used improperly, operators need to be able to face and resolve these problems in a timely manner.
A large thermal shock test chamber can be formed by the tank, the air circulation system, the refrigeration system and the heating system. When the high and low temperature experiments are carried out, the temperature rise is very slow, and the wind circulation system may not be normally opened, and the temperature change If the experimental temperature is not reached, it is necessary to solve the problem according to different states.
If the large-scale thermal shock test chamber does not reach the temperature change of the test index at low temperature, it may be that the temperature will always be very slow, or it may rise after the temperature reaches a certain value. When the above 2 cases occur, It is necessary to check whether the test chamber is in a dry environment before the low temperature test. After the test chamber is kept in a dry environment, the test sample can be placed indoors for testing. Another reason is whether the sample is placed too much, so that the air circulation in the room circulates. If this is not the case, the operator should contact the manufacturer for professional repairs.

There is another factor that may cause the failure, that is, the temperature control of the large thermal shock test chamber is not good, and the temperature in the laboratory where the equipment is placed is an environment with an average temperature of 25 ° C in 24 hours, and the humidity is about ≤ 85%. RH is fine. Even the best equipment needs a good place to be placed, and the large thermal shock test chamber is no exception. In order to ensure that the equipment can reach the temperature during the test and the life is extended, every operator should maintain it.
If the large-scale thermal shock test box fails, the operator needs to perform professional fault resolution to make the test box run smoothly.
Raccomandazioni correlate
-
There are usually three ways to control the temperature of laboratory reactors
9001. Manual control: Manually operate the knob on the front of the reactor controller.2. Control by PC: The PC and the controller are connected by a network cable, and the operation is carried out on the PC.3. Controlled by thermostat: Silicone oil...
Visualizza i dettagli -
Protezione contro le perdite per i refrigeratori di precisione raffreddati ad aria
1036I luoghi in cui è necessario un refrigeratore di precisione raffreddato ad aria indicano che hanno elevate esigenze di precisione operativa. Pertanto, è necessario elaborare le impostazioni di protezione. Quindi, quale tipo di protezione per il refrigeratore di precisione raffreddato ad aria dovrebbe essere...
Visualizza i dettagli -
What is the function of high temperature heat transfer fluid system?
988The high temperature heat transfer fluid system adopts a fully closed circulation system, so that there is no oil mist during high temperature operation, and high temperature refrigeration can be realized. It is the temperature control equipment u...
Visualizza i dettagli -
Manutenzione del sistema di controllo del riscaldamento con raffreddamento a glicole
1105Oltre all'attenzione necessaria durante l'uso quotidiano, anche il controllo e la manutenzione periodica del sistema di controllo del riscaldamento con raffreddamento a glicole sono molto importanti. Per aiutare tutti voi a imparare a utilizzare il riscaldamento a glicole in modo più efficiente, LNEYA...
Visualizza i dettagli