How to eliminate the failure of large thermal shock test chamber?
As technology continues to advance and improve, LNEYA recommends strict requirements for operators of large thermal shock test chambers. If used improperly, operators need to be able to face and resolve these problems in a timely manner.
A large thermal shock test chamber can be formed by the tank, the air circulation system, the refrigeration system and the heating system. When the high and low temperature experiments are carried out, the temperature rise is very slow, and the wind circulation system may not be normally opened, and the temperature change If the experimental temperature is not reached, it is necessary to solve the problem according to different states.
If the large-scale thermal shock test chamber does not reach the temperature change of the test index at low temperature, it may be that the temperature will always be very slow, or it may rise after the temperature reaches a certain value. When the above 2 cases occur, It is necessary to check whether the test chamber is in a dry environment before the low temperature test. After the test chamber is kept in a dry environment, the test sample can be placed indoors for testing. Another reason is whether the sample is placed too much, so that the air circulation in the room circulates. If this is not the case, the operator should contact the manufacturer for professional repairs.
There is another factor that may cause the failure, that is, the temperature control of the large thermal shock test chamber is not good, and the temperature in the laboratory where the equipment is placed is an environment with an average temperature of 25 ° C in 24 hours, and the humidity is about ≤ 85%. RH is fine. Even the best equipment needs a good place to be placed, and the large thermal shock test chamber is no exception. In order to ensure that the equipment can reach the temperature during the test and the life is extended, every operator should maintain it.
If the large-scale thermal shock test box fails, the operator needs to perform professional fault resolution to make the test box run smoothly.
Raccomandazioni correlate
-
ISG/TM Motor Test Cooling System High Voltage Failure and Treatment Measures
1940The ISG/TM motor test cooling system is divided into two types in the industry: air-cooled and water-cooled. The working principle is to first inject a certain amount of water into the water tank in the machine, and then pass the ISG/TM motor test...
Visualizza dettagli -
Manuale della macchina calda e fredda LNEYA SUNDI
2028The temperature range of the hot and cold machine ranges from -120 ° C to 350 ° C. It has superior performance and unique performance. It has high precision and intelligent temperature control. The high cooling power is from 0.5 to 1200 kW. High p...
Visualizza dettagli -
Quali sono i refrigeranti per il congelatore a bassissima temperatura a 120 gradi?
2035I refrigeranti dei diversi produttori di congelatori a bassissima temperatura sono diversi. I refrigeranti comunemente utilizzati nelle apparecchiature di refrigerazione LNEYA sono R404, R22, ecc. Qual è la differenza tra i due refrigeranti a bassissima temperatura (120 gradi)?
Visualizza dettagli -
Manutenzione del condensatore nei refrigeratori a bassa temperatura
1377Negli ultimi anni, con il miglioramento del livello di produzione industriale cinese, molti macchinari e attrezzature industriali professionali forniscono un aiuto maggiore per le diverse produzioni industriali. Come attrezzatura di refrigerazione industriale molto pratica, l...
Visualizza dettagli
Refrigeratori industriali LNEYA Produttore Fornitore